1994 - 2001
General Water Authority GWA (Libya)
TESCO Ltd.
- Supervision of well field construction
- QA/QC activities monitoring
- Multi-disciplinary team management (30+ experts)
Mr. Omar Salem
Secretary of GWA

1998 - 2000
Industrial Research Center
ER-Petro Ltd.
- Postgraduate technical training courses in Hungary
- Laboratory measuring methods and instrumental techniques
Mr. Salah Turki
Head of the Mining and Geological Research Dept.

2002 - 2003
Petroleum Research Centre
ER-Petro Ltd.
- Refurbishment and modernization of analytical and special laboratory equipment
- Digitization of instruments in Environmental and Oil-technological Labs
- Technical consultancy and engineering services
- Upgrade of PRC’s lab infrastructure
- Close cooperation with PRC specialists
Dr. Mohamed El Garni
Deputy General Director, Head of Laboratories

2001 - 2006
Petroleum Research Centre
ER-Petro Ltd.
- Postgraduate technical training in multiple scientific fields
- Thin section preparation techniques
- Trace element analysis in environmental samples
- Palaeontology training at the Geological Institute of Hungary
- Practical laboratory work and theoretical education
Dr. Mohamed El Garni
Deputy General Director, Head of Laboratories

2002 - 2003
Petroleum Research Centre
ER-Petro Ltd.
- Development of FlexInLog Reservoir Characterization software
- Reservoir characterization and geological data processing
- Application of the latest engineering and computational methods
- Oil and gas reservoir modeling
- PRC experts' testing and validation
Dr. Mohamed El Garni
Deputy General Director, Head of Laboratories

2005
Petroleum Research Centre
ER-Petro Ltd.
- Training courses on FlexInLog Reservoir Characterization software
- Training on the application of the software for reservoir characterization and geological data processing
- Hands-on sessions with the latest engineering and computational methods
- Courses held at PRC by Er-Petro experts in Tripoli
Dr. Mohamed El Garni
Deputy General Director, Head of Laboratories

2005 - 2006
Petroleum Research Centre
(Libyan Petroleum Institute)
ER-Petro Ltd.
- Reservoir Engineering Studies using MESBAR OIL
- MASRAB, ZAGGUT, KHALIFA, EL-LATEEF, GIALO mezők tanulmányozása, Waha Oil Company
- MESBAR GAS: SAHL field, Sirte Oil Company
- Consultancy and technical studies on reservoir engineering, applying the latest technologies and methods
Dr. Mohamed El Garni
Deputy General Director, Head of Laboratories

2005 - 2006
Petroleum Research Centre
ER-Petro Ltd.
- Reservoir Characterization studies with G-Cole software
- DAHRA PL7, SAMAH, BALAT AA1, AA6, VV5, NC98 fields, Waha Oil Company
- Consultancy and technical studies on reservoir characterization using G-Cole software
Dr. Mohamed El Garni
Deputy General Director, Head of Laboratories

2016 - 2017
Libyan Iron and Steel Company (LISCO), Misurata
ER-Petro Ltd.
- Installation of new water treatment system
- Replacement of tanks, piping and valves
- Implementation of SIEMENS S7 control system
- Construction of neutralization unit
- Training of operators and maintenance staff
N/A

2018 - 2021
Libyan Iron and Steel Company (LISCO), Misurata
ER-Petro Ltd.
- Dismantling of old chlorination system
- Supply and installation of new DeNora U-type chlorination units
- Replacement of pumps, valves, piping, and instrumentation
- Integration of SIEMENS S7 control system
- Commissioning and staff training
N/A

2020 - 2021
Libyan Iron and Steel Company (LISCO), Misurata
ER-Petro Ltd.
- Mechanical and chemical cleaning (derusting, degreasing)
- Cutting and replacement of damaged steel parts
- Surface preparation with grit blasting (SA2.5)
- External derusting and painting of tanks and pipes (600 m²)
- Internal inspection and repair of tanks (600 m²)
- Refurbishment of steel structures (1300 m²)
- Repair of decanter tank (24 m²)
N/A

2021 - 2025
Libyan Iron and Steel Company (LISCO), Misurata
ER-Petro Ltd.
- Dismantling of four old Cochran boilers
- Installation of four new BOSCH steam boilers (30 t/h each)
- Integration of new boilers into the existing power plant system
- Refurbishment of two SIDEM evaporators (originally built in the 1980s)
- Optimization of steam supply for desalinated water production
- Support for desalination process producing 10,000 mÂł/day for water treatment and re-treatment plant
N/A

2002 - 2006
Industrial Research Centre
ER-Petro Ltd / Geological Institute of Hungary
- Digital Geological mapping of scale 1:250 000 in cooperation with the IRC
Mr. Salah Turki
Head of the Mining and Geological Research Dept.

2008 - 2016
Industrial Research Center
ER-Petro Ltd.
- Digital Geological mapping of scale 1:250,000 in cooperation with the IRC
- Integration and upgrade of geological knowledge of the Kufrah basin
- New digital technology for field mapping and fast data processing
- Results uploaded to Libya's geological database
Mr. Salah Turki
Head of the Mining and Geological Research Dept.

2000
Industrial Research Centre
ER-Petro Ltd.
- Development and Implementation of a complete Geographical Information System (GIS)
- System design, delivery, installation, and continuous upgrades
- Integration with digital field data acquisition and geological mapping
- User training for system operation
Mr. Salah Turki
Head of the Mining and Geological Research Dept.

2004 - 2007
Industrial Research Center
ER-Petro Ltd.
- Design and Implementation of the Geological Database of Libya
- Development of a custom-tailored database structure
- Processing all available paper and digital geological data
- Providing information for decision-makers
- Creation of digital and paper thematic maps on raw material reserves, mineral deposits, and geological objects
Mr. Salah Turki
Head of the Mining and Geological Research Dept.

2015
Libyan Iron and Steel Company (LISCO), Misurata
ER-Petro Ltd.
- Services for heat treatment and disposal of Asbestos-containing materials on site
- Recycling hazardous Asbestos into non-hazardous material
- Creating a safe working perimeter at LISCO
- Using modern heat-treatment technology to destroy Asbestos fibrous structure
- Recycling output material for use in the construction sector
- Neutralizing or destroying additional communal and industrial waste
N/A

2003 – 2005
Petroleum Research Centre
ER-Petro Ltd.
- Development of next-generation reservoir engineering software
- Custom-built MESBAR OIL and MESBAR GAS applications
- Collaboration with Petroleum Research Centre experts
- Advanced modeling tools for oil and gas fields
- Software supporting research and production decisions
Dr. Mohamed El Garni
Deputy General Director, Head of Laboratories

1991 – 2012
ERMO GmbH (Germany), FMZ Engineering (Germany)
ER-Petro Ltd.
- Shutdown maintenance, Heat exchanger refurbishment
- Mechanical cleaning, High-pressure washing
- Gasket replacement, Welding
- Corrosion protection, Commissioning
- Quality control
N/A